4 ms·
In Germany half is currently stored in an old salt mine which is at risk of water breaking in (in a region with seismic activity) ... the other half sits in bri
by kgarten 13y ago
In Germany half is currently stored in an old salt mine which is at risk of water breaking in (in a region with seismic activity) ... the other half sits in bright daylight under tin roofs (not my definition of very very deep ... :)
- Xylakant 13y agoEven worse - the risk is not water breaking in, since that's already happening. The risk is total collapse and contamination of the ground water: http://en.wikipedia.org/wiki/Asse_II_mine http://en.wikipedia.org/wiki/Asse_II_mine So now the plan is to retrieve all the waste and store it - this time better at an estimated cost of at least 4 - 6 billion Euro. The general problem I have with nuclear power is that it's all fine and dandy as long as everything goes as planned. If not, then everything goes boom in a big way. And where humans and profits are involved, plans tend not to involve all failure modes: The explosions in fukushima could have been avoided using catalytic recombinators which are for example mandatory in germany [1]. [1] http://de.wikipedia.org/wiki/Reaktorsicherheit#T.C3.B6pfer-Kerzen http://de.wikipedia.org/wiki/Reaktorsicherheit#T.C3.B6pfer-K... (sorry, german)