4 ms·
Is it possible to switch the axis and set the maxima at 100%? I have to re-calibrate for each graph, or 30% almost looks like 50%. And it's hard to read the rot
by thezilch 13y ago
Is it possible to switch the axis and set the maxima at 100%? I have to re-calibrate for each graph, or 30% almost looks like 50%. And it's hard to read the rotated labels, but the percent on the horizontal axis would not need to be rotated.
- paulmillr 13y agoAs for maxima — yeah, definitely. Done.
- thezilch 13y agoGreat. Just to expand on the switching of axis. It's harder to compare data between graphs, but upon second inspection, it appears the colors from the first graph are not used in the secondary graphs. Second, trying to get to the projects in the first graph, it's easier to exit the graph from the bottom. Otherwise, short bars (eg. node) are hard to "select" for the "Current" line, and in that case, I have to make a longer trip around the graph to get to the link. Maybe link the labels? Move the "Current" line underneath? I enjoyed it nonetheless. If you're considering expanding or having a follow-up piece, I'd enjoy combining the three graphs with the format / filtering at http://www.techempower.com/benchmarks/ http://www.techempower.com/benchmarks/.