2 ms·
Also about ten percent of the heat energy is released later on, delayed, decay heat and all that. So there is no off switch. If you were running at 3000 MWt,
by VLM 14y ago
Also about ten percent of the heat energy is released later on, delayed, decay heat and all that. So there is no off switch. If you were running at 3000 MWt, 5 minutes after you scram you still have to do "something" with 300 MW of heat, and you don't want to have to rely on just one diesel. So the feds require multiple sources of power to operate, one of which is usually the diesel and one is the the grid.
Lets say your control and cooling systems require 5% of the heat they handle, that means your 3 GWt nuke would require an absolute minimum of 15 MWe to spin down. Or four if you want to run off grid so you've got two completely independent sources of power each with a 24x7 hot backup (I believe no one ever took the NRC up on that offer, but I could be wrong)