Because almost all of the cost of the network does not depend on usage?
by wmf 14y ago
Because almost all of the cost of the network does not depend on usage?
- rayiner 14y agoSo what? There is certainly a capital cost to building and maintaining the network, which scales with the provisioned capacity. That fixed cost can be apportioned on a per-GB basis. It's not different than the electric grid. Power plants are pretty much binary creatures--they're either on or off. Each incremental kWh doesn't really cost any more once the plant is up and operating at design capacity, except to the extent that sufficient extra kWh might necessitate more capacity and thus more fixed costs.
- lmickh 14y agoThose extra kilowatts can be sold to other areas. That is exactly what is happening in most instances. You can't sell the left over bandwidth of an infrastructure you provide to a consumer.
- eru 14y agoThat depends on the power plant type. Gas fired power plants are very much variable. Nuclear not so much.
- zero_intp 14y agowhat metric would you use instead? Statistical multiplexation of the service rate (bandwidth) is the inflection for cost to the consumer. On most SP networks, if aggregate user constant load utilization increases past 10-15% committed rates, the cost model must bear service load into account.
- wmf 14y agoThere are several possible business models: Charge every customer the same amount, charge per Mbps, charge per GB, etc. I don't think there's one "obviously correct" business model.
- zero_intp 14y agoit's not to say that there is one obviously correct model, but to say there are clearly very incorrect models. While portions of the public want to buy 'unlimited' service, the only way that 'unlimited' service can exist at rates not deemed unrealistic is if most users of the 'unlimited' services do not create heavy usage. It's a tanstafl issue; once everyone is a heavy user, the subsidy created by uneven usage no longer exists.