4 ms·
I would say it was an initial push on 1.5 months of one engineer with 10% of time of one engineer for maintenance. As the load increases we have to invest a few
by nikita 14y ago
I would say it was an initial push on 1.5 months of one engineer with 10% of time of one engineer for maintenance. As the load increases we have to invest a few days here and there to scale the system.