3 ms·
I personally hate standups. They are the 21st century version of Chinese Communist style Daily Morning Exercises. http://www.youtube.com/watch?v=o_2C3bvh6ms h
by ardit33 14y ago
I personally hate standups. They are the 21st century version of Chinese Communist style Daily Morning Exercises. http://www.youtube.com/watch?v=o_2C3bvh6ms http://www.youtube.com/watch?v=o_2C3bvh6ms
Usually they either are void of real information (as they are supposed to be quick) and nothing is discussed in depth, or if things do end up discussed they end up taking too long.
Unfortunately they have propagated in most work places/engineering cultures.
Information should flow naturally between engineers. If you have a jelling team, people should communicate with each other naturally, without having to be forced to stand up and listen to status reports (that's exactly what standups are).
I prefer once or twice a week engineering 30mins sync ups. Short meeting, that get to the point on whats going on, and you have some time to discuss things in depth if needed. For any small things, the expectations would be that engineers should communicate with each other directly.
Instead of having 5 interruptions a week, you have one or two (slightly larger ones). At the end of the day accountability should be on the delivery of projects (end results), and not efforts (which standups are more about showing efforts, rather than results).
From personal experience, experienced engineers tend to highly dislike them, and the over-reliance on standups is an indication of a weak engineering culture.