Configuring the B-side computer to take control of the rover may take ... several days, maybe a week I wish they had provided more information about what needs
by ams6110 14y ago
Configuring the B-side computer to take control of the rover may take ... several days, maybe a week
I wish they had provided more information about what needs to be done. I would think the backup computer would be sort of a "warm standby" that could be switched over pretty quickly, from this it sounds like they need to upload data or software first.
- Shank 14y agoAccording to NASA, "Curiosity is now operating on its B-side, as it did during part of the flight from Earth to Mars."[0] Presumably, it retained some programming for recovery (as a backup) from the flight, and they didn't have an exact replica of the software A-Side had on B-Side. That being said, they probably have debugging/test software on which ever is serving as the backup computer in order to diagnose and fix the other one in the event of a problem. [0]: http://www.jpl.nasa.gov/news/news.php?release=2013-078 http://www.jpl.nasa.gov/news/news.php?release=2013-078
- rhino42 14y agoI work at NASA / JPL (but I'm not part of the MSL team, or any flight software team). We learn a good bit about good flight practices though. Here's what probably happened: Someone found the problem as a behavioral anomaly or weird status bits. It gets reviewed and escalated a few times until the important people know. For class-A missions (I think lower classes too), we have performed fault analysis on each component (and the system as a whole), so that we can match an observed behavior to the actual underlying issue through something like a flowchart. I don't know for sure, but it was probably a bit harder for a bit-flip, but I wouldn't be surprised if they had provisions for that too. However, these high-profile projects are extremely risk-adverse, so they'll review any non-standard commands heavily before transmitting them. teams (plural) probably reviewed this failure before confirming the initial conclusion. The week was accounting for this through analysis and review process. (my opinion is my own, and doesn't represent NASA or JPL)