6 ms·
But "stuff that was stable 4 months ago" is not a trivial case either. Suppose A version 1.1 was stable 4 months ago, but that the version of B that works with
by homeomorphic 14y ago
But "stuff that was stable 4 months ago" is not a trivial case either. Suppose A version 1.1 was stable 4 months ago, but that the version of B that works with A 1.1 is horribly buggy still, and the stable version of B needs A 1.0. Do we upgrade A? I can imagine this becoming very tough to mange with 20k-30k packages. I hope Canonical can deal, but I do fear that the users will suffer.
- sp332 14y agoIf it's a library, it should be trivial to have the latest A 1.1 installed alongside older A 1.0 and stable B.
- homeomorphic 14y agoWith potentially hundreds of different packages playing the role of B, this could eat up a lot of manpower. What if the breakage is subtle and not well known upstream? While it could work, it sounds like something that would take a lot of QA work by Canonical.
- Avshalom 14y agoThat problem already exists, except currently there is generally a six month minimum before it gets resolved.
- homeomorphic 14y ago> That problem already exists, except currently there is generally a six month minimum before it gets resolved. I view it differently: Currently, the situation doesn't unexpectedly change for six months :-)