Doing that kind of testing is hard. It costs time and effort. If you want to see it done on a truly awe-inspiring scale (whole data centers being taken down by
by groby_b 14y ago
Doing that kind of testing is hard. It costs time and effort. If you want to see it done on a truly awe-inspiring scale (whole data centers being taken down by zombies ;) : http://queue.acm.org/detail.cfm?id=2371516 http://queue.acm.org/detail.cfm?id=2371516
- ajross 14y agoDoing this kind of testing in a gold-plated, heavily-engineered way is hard. But that's not an excuse for not doing it at all. Just walking into your closet and pulling a cable gets you 80-95% of the testing you need, and is free. Setting up a sandbox and "restoring" a backup onto it and then doing some quick queries is likewise easy to do and eliminates huge chunks of the failure space of "bad backups". Really, this attitude (that things have to be done right) is part of the problem here. To a seasoned IT wonk, the only alternative to doing something "The Right Way" is not doing it at all. And that's a killer in situations like these. Don't hack your systems to make them work. Absolutely do hack at them to test.
- PeterisP 14y ago"walking into your closet and pulling a cable" is not free, if your planned disaster recovery is not a seamless failover, but a process to recover data with some work and limited (nonzero) downtime/cost to business. For example, our recovery plan for a financial mainframe in case of most major disasters was to restore the daily backup to off-site hardware identical to production hw; however, the (expensive) hardware wasn't "empty" but used as an acceptance test environment. Doing a full test of the restore would be possible, but it would be a very costly disruption; taking multiple days of work for the actal environment restoration, deployment,testing and then all of this once more to build a proper acceptance-test-environment. Also destroying a few man-months worth of long tests-in-progress and preventing any change deployments while this is happening. All of this would be reasonable in any real disaster, but such costs and disruptions aren't acceptable for routine testing. "Chaos Monkey" works only if your infrastucture is built on cheap unstable and massively redundant items. You can also get excellent uptime with expensive, stable, massively controled environment with limited redundancy (100% guaranteed recovery, but not "hot failover") - but you can't afford chaos there.
- ajross 14y agoTo paraphrase: if you go with a awful hack job for your disaster recovery plan, testing is more expensive. And to extend: you won't actually test because it's "too expensive", and your disaster recovery plan won't work. How is this distinct from "Don't hack your systems to make them work. Absolutely do hack at them to test."? I don't see it. This just sounds like "my business doesn't have the financial capacity to engineer data recovery processes". Well, OK then. Just don't claim to be doing it.
- PeterisP 14y agoWe did know that we can recover backups because we did it for small parts of data, and we know that we can do disaster recovery because (a) we did test this, though very rarely; and (b) we had successfully recovered from actual full-scale disasters twice over ~7 years. But successful, efficient disaster recovery plan doesn't always mean "no damage" - it often means damage mitigation; i.e., we can fix this with available resources while meeting our legal obligations so that our customers don't suffer; not that there aren't consequences at all - valid data recovery plans ensure that data recovery really is possible and details how it happens, but that recovery can be expensive. And while you can plan, document, train and test activities like "those 100 people will do X; and those 10 sales reps will call the involved customers and give them $X credit", you really don't want to put the plan into action without a damn good reason. For example, a recovery plan for a bunch of disasters that are likely to cut all data lines from a remote branch to HQ involves documenting, printing & verifying a large pile of deal documents of the day, having them shipped physically and handled by a designated unit in the HQ. The process has been tested both as a practice and in real historical events. However, if you "pull a wire in the closet" and cause this to happen just so, then you've just 'gifted' a lot of people a full night of emergency overtime work, and deserve a kick in the face.
- ajross 14y agoOK, tough love time: All I can say is that you're very lucky to have a working system (and probably a company to work for), and I'm very lucky not to work where you do. Seriously, your "test" of a full disaster recovery was an actual disaster! More than one! And frankly, if your response to the idea of implementing dynamic failure testing is that someone doing that should be "kicked in the face" (seriously, wtf? even the image is just evil), then shame on you. That's just way beyond "mistaken engineering practice" and well on the way to "Kafkaesque caricature of a bad IT department". Yikes. Admittedly: you have existing constraints that make moving in the right direction expensive and painful. But rather than admit that you have a fragile system that you can't afford to engineer properly you flame on the internet against people who, quite frankly, do know how to do this properly. Stop.
- alxndr 14y agoWhat about Chaos Monkey?