At Blekko we ended up moving 600 servers from one co-location facility over to a neighboring town about 5 miles away. It is a lot of work, and its a lot of co-o
by ChuckMcM 14y ago
At Blekko we ended up moving 600 servers from one co-location facility over to a neighboring town about 5 miles away. It is a lot of work, and its a lot of co-ordination. When I was at Google I thought they were just being arrogant by designing their own racks, building them and shipping them in pre-built "chunks" to the data center. I was very wrong about that, it saves a huge amount of time.
I look forward to a time when a colo facility says something like "We can lease you 50 OpenCompute 2.0 slots for $3,000 a month" and know that I can just populate the hardware, plug my switches into the structured wiring solution and be done.
Not sure if Colos will last that long though :-)