3 ms·
That's an annoying aspect of trying to retrofit old roads with new tech. Roads designed for ramp metering (in Australia at least) have much longer ramps, both b
by stephen_g 14y ago
That's an annoying aspect of trying to retrofit old roads with new tech. Roads designed for ramp metering (in Australia at least) have much longer ramps, both before and after the signal (enough space after for the car to accelerate to the speed of the motorway from being stopped, and before to stop the queue clogging surface streets).
But, it could also be a problem with the algorithm they use. The more simple algorithms generally don't take queue length into account, but ALINEA/HERO, which we use in Victoria has queue control.