3 ms·
The pulse idea is neat. How do you handle jobs where the expected runtime is longer than the heartbeat interval?
by adityamishra241 2mo ago
The pulse idea is neat. How do you handle jobs where the expected runtime is longer than the heartbeat interval?
- 4815162342 2mo agoGood question! There's no such thing as a "running" task/job at the moment (i.e., a start signal). The closest thing is lengthening the grace period, but that also means that the notification is delayed, so it's not really a solution. This is in the backlog.
- msupuka 2mo agoThe usual fix is a second ping at the start of the job: the schedule check watches the start ping, and a separate “max runtime” check watches the gap between start and finish. You get alerted promptly either way without inflating the grace period.