5 ms·
If I did the math right, Seattle-area Federal Way Link Extension costs $185k per yard, getting 81 yards for $15M. God we're terrible at building things.
by coryrc 14d ago
If I did the math right, Seattle-area Federal Way Link Extension costs $185k per yard, getting 81 yards for $15M.
God we're terrible at building things.
- kQq9oHeAz6wLLS 13d agoIs that the California high speed rail I see trying to hide in the back?
- coryrc 12d agoShit, who cares how much it costs when it doesn't go useful places?
- shawn_w 13d agoDon't forget the decades of time it takes to build the tracks.
- kazinator 12d agoWow, I pinned the tail on that donkey, it seems, with zero fact checking on the figures before posting.