4 ms·
Quite possibly, depending on grid-scale renewable deployment. I also am about to install a set of solar panels, so a base level of power will cost me only the d
by rbanffy 1mo ago
Quite possibly, depending on grid-scale renewable deployment. I also am about to install a set of solar panels, so a base level of power will cost me only the depreciation of the PV hardware.
We could condition datacenter installs to providing power to the grid - you want to build a datacenter, you also need to build a wind or solar farm that can fully power its peak load.
- cyanydeez 1mo agoAmerica has decided the answer is no.