3 ms·
In some software development methodologies, "spike" is a task whose goal is figuring something out instead of delivering shippable code. https://agiledictionary
by Kwpolska 1mo ago
In some software development methodologies, "spike" is a task whose goal is figuring something out instead of delivering shippable code. https://agiledictionary.com/209/spike/ https://agiledictionary.com/209/spike/
- Espressosaurus 1mo agoWhy can't they call it a prototype or experiment? Sheesh.
- bloomca 1mo agoPrototype is usually something working, while spike can be pure research (e.g. validate that APIs are feasible and enough, or that something satisfies requirements). Prototype is usually more polished/usable. Experiment in my mind is something which user-facing but not in stable yet. So for me they are differentiated enough, but could be that I am just used to it.
- Espressosaurus 1mo agoAn experiment doesn’t say anything about user facing or not. I do tons of them when reverse engineering poorly documented hardware and APIs to determine if the thing I’m trying to do is even supported.
- bloomca 1mo agoIn general, yes, but I would say "experimental features" is a pretty widely used term, so in my mind the association with something user facing is strong.
- bitwize 1mo ago"Spike" comes from Extreme Programming where it means specifically code written without TDD. Code that wasn't written against a pre-existing test is by definition broken, and should not go into production. So you create a simple "spike solution" to explore the problem space, so called because it cross-cuts concerns like a spike going through wood or something, I dunno. Spikes are explicitly time-boxed to keep the team focused on the red-green-refactor churn which is the software engineering process in XP.
- smj-edison 1mo agoTIL that agile has its own words for everything.
- swader999 1mo agoThat was a thing in the early 2000's. You had to have a blog and invent words that describe regular things everyone did.