2 ms·
There is no standard for beaming power from orbit to the ground
- Yahalomi 3mo agoAuthor here. Context on why this exists, and what it isn't. I went looking for the spec that governs a satellite beaming power to a receiver it doesn't own, expecting to find one and profile it. There isn't one. ITU-R's only wireless-power Recommendation is scoped to phones and sensor networks. SM.2392-2 names 5.8 GHz but it's a Report, so it recommends nothing. The Radio Regulations carry no Article 21 space-to-Earth row for that band. WRC-27 has no agenda item, ITU-R SG3 doesn't sit again until June 2027, IEEE's ICES lists no active projects, and CCSDS is comms and navigation only. Each of those is a dated row with a URL in gap-analysis.md, because "nobody covers this" is a claim that ages. I'd rather it visibly went stale than quietly became false. Meanwhile there are at least seven funded programmes across two incompatible physical layers, and a 2027 flight carrying five power-beaming payloads from different companies on one bus. The design bit that might interest people here: the interlock inverts the usual direction. Instead of the ground sending "stop", the ground must continuously send "you may continue", as short-lived signed tokens. If the link dies, the beam dies with it. A stop command has to arrive during exactly the failure that stops messages arriving; a dead-man doesn't. The token also carries a power ceiling, so "curtail" and "continue" are the same message and there is one code path instead of two. A consequence I liked: the token lifetime and the declared intruder speed multiply out to the keep-out buffer. Five seconds at 250 m/s is 1,350 m of annulus. A timing parameter becomes land you can see on a map, and it's the difference between a remote site and one you can't build next to an airport. What it is not: a standard. No body has reviewed it, it has one implementation (mine), and several numbers are arithmetic rather than measurement. OBJECTIONS.md carries eight open arguments against it that I wrote myself, and one I can't answer at all: the geometric corridor check is nearly useless at GEO, where a 2 km aperture subtends 0.0032 degrees, and I don't have a fix. One RF power-beaming engineer has been through it so far and found two real errors. Both are logged in DISPOSITIONS.md with my concession, including one where I'd claimed two published efficiency figures weren't comparable and he showed they were. The two things I actually need are someone who works in optical power beaming to write that annex, and an RF safety engineer, because ICNIRP switches to a SAR basis below 6 GHz and 5.8 is below 6. Corrections wanted, especially the ones saying this is wrong.