3 ms·
I remember people taking about smelting aluminum as a way to put overproduced solar electricity to a good use. Would come in very handy now.
by nine_k 2mo ago
I remember people taking about smelting aluminum as a way to put overproduced solar electricity to a good use. Would come in very handy now.
- sandworm101 2mo agoIt would, but smelting is not a process that likes being started and stopped. Once furnaces and other bits and pieces are up to temperature they want to stay there. Thermal expansion is a thing, but also letting them all cool down is throwing energy away. And iron workers don't like sitting around "on call" waiting for energy prices to swing enough to justify going to work. Same too with customers. The people buying bulk metal need is when they need it. They don't want to wait around, literally, for the winds to change.
- inigyou 2mo agoAluminium smelting is an electrochemistry process.
- defrost 2mo agoCan you expand on what relevance this has to the pragmatic thermal process based point raised in the comment above yours? The aluminium smelters I've had contact with have all avoided any shutdowns (back up generators, etc) because any significant breakdown in continuous processing involves several days of tear down in order to restart. I am literally within 20 feet of someone who worked 5 years as a general foreman in charge of the smelter portion of the Portland aluminium smelter* who is not embracing the idea that this a process you can just turn off and turn on again later w/out a large chunk of effort. * https://en.wikipedia.org/wiki/Portland_aluminium_smelter https://en.wikipedia.org/wiki/Portland_aluminium_smelter
- inigyou 2mo agoThe relevance is that you would have a base load to keep the system hot which is separate from the electricity that does the work. I think at a steel smelter, since the heat does the work, they aren't as easily separable. You would still use less energy at the times when you processed less metal. Aluminium smelters were traditionally some of the biggest loads on the grid. They were built near hydroelectric dams and had contracts with electricity providers to absorb excess energy and to pause operations on short notice when other demand is high. In exchange for this they get it very cheap, which is good because they need a lot of it. Variable energy supply is not new to them. Now I've never worked at either and I'm just spitballing ideas on the internet, but you haven't either and you are too.