3 ms·
I would still pay ~500 for a chip that runs 10kt/s of a ~100b model on my machine even if the half life is 6months. I m sure my employer would too. Qwwen3.5 12
by Iolaum 2mo ago
I would still pay ~500 for a chip that runs 10kt/s of a ~100b model on my machine even if the half life is 6months. I m sure my employer would too.
Qwwen3.5 122b was released 6 months ago and is still best in class overall 100-140 B param model.
- jeffybefffy519 2mo ago10000%
- x-complexity 2mo ago> I would still pay ~500 for a chip that runs 10kt/s of a ~100b model on my machine even if the half life is 6months. .... :T Considering the 8B model uses 53 billion transistors, that's 6.625 transistors per parameter. https://taalas.com/products/ https://taalas.com/products/ Assuming they can get it down to 3 (somehow), that's still 300 transistors, or 5.565 RX 9070s. https://www.techpowerup.com/gpu-specs/radeon-rx-9070.c4250 https://www.techpowerup.com/gpu-specs/radeon-rx-9070.c4250 You're looking at 1) waiting for another 3-5 generations of transistor improvements before it can fit into a single conventional chip, or 2) another generation before getting a monster of a chip (1000+ mm^2), and prices for flawless etching scale quadraticly (likely $1000+ for manufacturing costs alone). Could happen, but it's a long shot for a market that could be satiated by specialized accelerators.
- mdp2021 2mo agoIn Taalas HC2 a chip embeds 20b parameters, and the declared idea is linking the chips. A card with two of them chips and you can already have a dense Qwen at staggering speeds.
- x-complexity 2mo agoChiplet-style layouts could cut the etching quality requirements per chip down, but it still can't avoid the base cost for manufacturing silicon.
- mdp2021 2mo ago> it still can't avoid the base cost for manufacturing silicon What costs are you talking about and why would them be a problem? If it is the price: «Kharya says it costs 100x as much to train a model then to get a customize HC chip in reasonable volumes from Taalas» ( https://www.nextplatform.com/compute/2026/02/19/taalas-etches-ai-models-onto-transistors-to-rocket-boost-inference/4092140 https://www.nextplatform.com/compute/2026/02/19/taalas-etche... ). That is thinking about an LLM (logical) producer and server. For mass production, the costs go down. And in the case of a ~100b model as the poster mentioned, they would be just single PCI cards with 5 or 6 HC2 chips: doable and practical. I see more potential problems in the positioning of the SRAM - but not a real problem given that excellent team. To get a proper idea of the costs the architecture of the HC2 will have to be clearer.
- dgellow 2mo ago500 what? You’re missing the unit