2 ms·
As I understand, initially, the power production was done on-site using gas turbines. Later, these were moved to Mississippi and a high voltage powerline conne
by throwaway2037 2mo ago
As I understand, initially, the power production was done on-site using gas turbines. Later, these were moved to Mississippi and a high voltage powerline connected the two sites. After this change, why is the Memphis data center not clean and ecofriendly for residents of Memphis?
- e40 2mo agoYou moved the goalpost. You said they are clean as could be. While temporary, sure, it was a horrific situation for the nearby residents.
- ryathal 2mo agoLater is just as likely to never happen, as happen. Billionaires have promised all sorts of things to get tax breaks for the things they want and never followed through with the parts that benefited others.