3 ms·
I mean its capex vs opex, assuming a 5 year deprecation period thats 1.2 million isnt too bad, its 10% of their aws spend.
by AlphaSite 2mo ago
I mean its capex vs opex, assuming a 5 year deprecation period thats 1.2 million isnt too bad, its 10% of their aws spend.
- manquer 2mo agoThat is the starting point though , minimum you need to buy one more for FO/DR if you care about uptime . It is not once and done you have some continuous costs in either direction. 1. you will not be able to still move all your workloads only your base loads . 2. There will be residual workloads not only if they are spot/flexible bursts but also they are too deeply integrated to Paas offerings . 3. you have to pay for power cooling and network (and its backup) for 5 years . 4. Finally you also have pay for infra team to maintain, this is increasingly difficult (and expensive) to hire and retain . Don’t get me wrong I would love to be able buy something like this, but the cost economy is pretty steep and 1-2M spends is too early (it is not on oxide, serious hardware costs a ton these days )