3 ms·
You cannot have big storage either way. Its normal to have two installations and be able to switch between them. Not in Poland, because you are too independent
by pojzon 2mo ago
You cannot have big storage either way. Its normal to have two installations and be able to switch between them.
Not in Poland, because you are too independent.
- leonidasrup 2mo agoThe legislation was updated: "According to the adopted act, devices with a capacity of up to 30 kWh are exempt from any construction procedures; only reporting to the grid operator (OSD) is mandatory. Those between 30 kWh and 300 kWh in a building and 30 kWh and 2000 kWh freestanding are obliged to prepare a land development plan and make fire safety arrangements." https://renewablesnow.com/news/poland-adopts-rules-to-ease-energy-storage-in-dialogue-with-industry-1284887/ https://renewablesnow.com/news/poland-adopts-rules-to-ease-e...