4 ms·
It's still the same thing, you can ask it to do a full on report give explanation and details be thorough and then go do something else, another task a lunch br
by nolok 3mo ago
It's still the same thing, you can ask it to do a full on report give explanation and details be thorough and then go do something else, another task a lunch break whatever and it will be done when you're back
- allknowingfrog 3mo agoHow do you maintain a flow state during a lunch break? I'm looping with Claude on a scale of minutes. While you're waiting, I'm iterating.
- deleted 3mo ago[deleted]
- vitally3643 3mo agoThis is like comparing a hammer to a screwdriver and feeling smug because you can hammer nails faster than someone else can drive screws. These are fundamentally different tools for entirely different applications. They only look similar to people who don't understand the tools or their purpose.
- allknowingfrog 3mo agoThis thread started with me saying "we clearly have different goals" and then being told that I just need to hold the screwdriver differently...
- fwip 3mo agoYou don't "maintain flow." You eat lunch. I swear, tech culture has gotten people wanting to work for the machines, rather than the other way round.
- ClikeX 3mo agoRight? Tech should make my work easier. Not have me stressing out even more. Let the machine do its work while I relax, I’ll check up on it later.
- allknowingfrog 3mo agoThis was a discussion about LLM usage patterns. I'm not opposed to lunch breaks. I'm opposed to being required to take the equivalent of 12 lunch breaks a day while I wait for slow responses.
- Aurornis 3mo ago> another task a lunch break whatever and it will be done when you're back At 5 tokens per second and unknown prompt processing speed, you may need a very extra long lunch break depending on your codebase.