3 ms·
No idea what you're talking about. My local utility lit up 100MW of solar over the last year alone. Everywhere I look is doing the same.
by timschmidt 3mo ago
No idea what you're talking about. My local utility lit up 100MW of solar over the last year alone. Everywhere I look is doing the same.
- Matticus_Rex 3mo agoHe's talking about the interconnection queue. You see the 100MW of solar they're wiring up, but not the hundreds of gigawatts in the queue.
- timschmidt 3mo agoI imagine it'd be a lot easier to get a giant datacenter through the queue and connected if said datacenter also generated more than it's own needs with solar and grid scale battery. You'd essentially be asking the grid to act as a backup and sink for spare generation. Avoiding a need for central generation capacity buildout.
- ch4s3 3mo ago> I imagine it'd be a lot easier to get a giant datacenter through the queue and connected if said datacenter also generated more than it's own needs You'd be wrong. Projects get evaluated FIFO, and each has to do a grid impact study. Data centers are buying other generation projects to get a better position in line. This is all the result of bad regulation.