3 ms·
Run the apply via a pipeline. Pr merged in. Plan runs. Approval gate for apply.
by nat8265639392 4mo ago
Run the apply via a pipeline. Pr merged in. Plan runs. Approval gate for apply.
- InvertedRhodium 3mo agoWorks on our staging and production environments, but the feedback loop is too long for development. I mean, if it was literally the only way then we’d live with it, but ensuring everyone is using the same version is enough.