3 ms·
It's available from 2027-04-01 to 2027-05-01, so basically deconstruction will be done during April. The bridge seems to be legit from 1876. Local news says the
by nairboon 4mo ago
It's available from 2027-04-01 to 2027-05-01, so basically deconstruction will be done during April. The bridge seems to be legit from 1876. Local news says they'd rather sell it to someone for cheap to support circular economy than throw it into the trash. https://www.tagesanzeiger.ch/sbb-verkauft-historische-bruecke-aus-hinwil-678862127108 https://www.tagesanzeiger.ch/sbb-verkauft-historische-brueck...
You might be able to make a good deal here, buy a bridge for 100 bucks.
- fp64 4mo agoBut please note that the bridge will be available without the guard rail / fence, parts of the concrete might be missing, and the rust proofing needs a refresh!
- Leherenn 4mo agoI love how they clarify that it is used.
- secretsatan 4mo agoPretty sure that here in switzerland, demolition has to be as recyclable as possible, straight up selling the whole thing would be cost effective i guess.