4 ms·
I call B.S. on this
by sixQuarks 14y ago
I call B.S. on this
- ChuckMcM 14y agoActually not BS, see the Broad Group's web site and their timelapse of the 'demo' project [1]. They don't count the time to put in the foundation and drive the pilings, just the erection part. That part consists entirely of lifting pre-fabricated sections in place, connecting pipes and wires, welding to the rest of the building and moving on to the next one. [1] http://www.youtube.com/watch?v=Hdpf-MQM9vY&noredirect=1 http://www.youtube.com/watch?v=Hdpf-MQM9vY&noredirect=1
- sixQuarks 14y agoI've seen that already, and yes, it's impressive, but watch and see, this isn't going to be built in 90 days, or next year. Probably never.