> Like, if waterfall of a project can be done in 2 weeks, is it agile now? Sure. The thing is, the waterfall guys would tell you it's impossible to do it in 2
by mpyne 5mo ago
> Like, if waterfall of a project can be done in 2 weeks, is it agile now?
Sure. The thing is, the waterfall guys would tell you it's impossible to do it in 2 weeks because you need to have written down everything first. "Thousands of pages" was the terms they used.
Agile guys would point you to the Agile manifesto which would lead you to "working code over documentation" and "people over process".
A 2 week period to go from initial spec to product in a user's hands to capture feedback and make changes from there is much closer to agile than to waterfall. In fact it's more or less exactly some older versions of Scrum (which didn't permit deviating from the planned sprint user stories midway through the sprint, instead changes influenced the subsequent sprint).
- rzzzt 5mo agoThe DoD's 2167 standard from the late '80s mentions the following documentation that should be produced as part of the development process (section 6.2 and Appendix D): - System/Segment Specification - Software Development Plan - Software Configuration Management Plan - Software Quality Evaluation Plan - Software Requirements Specification - Interface Requirements Specification - Software Standards and Procedures Manual - Software Top Level Design Document - Software Detailed Design Document - Interface Design Document - Data Base Design Document - Software Product Specification - Version Description Document - Software Test Plan - Software Test Description - Software Test Procedure - Software Test Report - Computer Sytem Operator's Manual - Software User's Manual - Computer System Diagnostic Manual - Software Programmer's Manual - Firmware Support Manual - Operational Concept Document - Computer Resources Integrated Support Document - Configuration Management Plan - Engineering Change Proposal - Specification Change Notice
- ebiester 5mo agoThis is a particular artifact of the government system process. These are contracted pieces of work that Company A would deliver, Company B would administer, and Company C would be contracted out for additional work. Further, all specifications were created ahead of time because changes would cost extra. (Anyone who has done government contracting can talk to the shenanigans involved with it - I have not lived in this world for a long time.) That said, we still do ad-hoc versions of many of these. For example, a system/segment specification today is an OpenAPI document between microservices. Most larger SaaS companies have the equivalent of a Software Configuration Management plan - Who can change terraform or a GHA, what are the standards that they conform to (linter, peer review standards).
- mpyne 5mo ago> This is a particular artifact of the government system process. Yes, a government process meant to implement the waterfall approach. If you look at Dr. Royce's paper which originated the concept, he was very explicit that it required upwards of thousands of pages of documentation to be written up front, if you were doing it "right". By the time the required documentation had all been written, there should be essentially nothing left to do but to actually type out the punch cards as specified and turn then into a system of compiled programs. Now, this appealed to government because it put documentation in place that was felt to be more viable for contracting processes, but ever since Dr. Brooks chaired a 1987 Defense Science Board study on the issues already facing the DoD trying to implement waterfall methods, they've been trying to restructure their software acquisition methods to pursue better outcomes rather than more concretely defined outputs. Of course it's still a tremendous challenge for them even now, and it remains common to see defense acquisition projects that will say "Agile" to the right people even as they prescribe a full waterfall-style 'system engineering V' approach behind the scenes. The ad-hoc responses that the commercial space often involves is usually more appropriate, believe it or not. They get process added when process is helpful, but not before it is helpful.
- rzzzt 5mo agoIndeed, I came across this not as a contractor but in my university textbook :) I wanted to collect the document list that forms the "thousands of pages" mentioned above in the waterfall model.
- mpyne 5mo agoYeah and that's helpful too, because we typically talk about caricatures about both agile and waterfall and I think people truly don't realize that waterfall isn't simply "think about what you do before you do it" and nor is agile "code first; think later". If people truly understood what waterfall is and how it's supposed to be carried out, they'd be less apt to recommend it. Nothing prevents a team from employing planning in an agile effort, but doing this doesn't turn it into a waterfall project and you shouldn't describe it as such. If anything, teams that refuse to use agile (thinking it inherently means meetings, story points and not looking beyond 14 days) often send up choosing something even simpler, like cooking up a simple design doc of 4-6 pages before implementing it. But that's still not waterfall, it's just another of the infinite renditions of agile methods that are out there, just without the consultancies issuing formal training certs.
- bdangubic 5mo agoat one point or another in my career (gov contracting) I had to write or co-write or review every one of these. and without fail, within 6-12 months they would be stale/inaccurate/obsolete/… the truth is, even on projects where sufficient time is allocated to write these, there is never (literally) time allocated to keep them up-to-date