4 ms·
The failure was pretty much forced. This was a cost plus contract, if NASA didn't want to dig into the blowby issue they weren't really in a position to do so.
by LorenPechtel 6mo ago
The failure was pretty much forced.
This was a cost plus contract, if NASA didn't want to dig into the blowby issue they weren't really in a position to do so.