4 ms·
Where are you getting those numbers? I can't find a single source that quotes levelized cost of new nuclear above €150/MWH for newly constructed nuclear? Some
by amarant 6mo ago
Where are you getting those numbers? I can't find a single source that quotes levelized cost of new nuclear above €150/MWH for newly constructed nuclear?
Some put it below €100/MWH!
Wikipedia for example puts it at $97/MWH
https://en.wikipedia.org/wiki/Economics_of_nuclear_power_plants https://en.wikipedia.org/wiki/Economics_of_nuclear_power_pla...
- ViewTrick1002 6mo agoBelow €100/MWh is pure fantasy. The proposed subsidy scheme for the French EPR2 fleet is a €100/MWh CFD for 40 years and interest free loans. Summing up to ~€200/MWh in total. Then you have studies like this: https://www.lazard.com/research-insights/levelized-cost-of-energyplus-lcoeplus/ https://www.lazard.com/research-insights/levelized-cost-of-e... And like the Hinkley Point C CFD which is somewhere around €170 per MWh. It’s quite typical that you refer to the data from IPCC AR3 WG3. A study which came out in 2001. I suggest some curiosity and updating your priors to 2026 instead.
- amarant 6mo agoYour source provided several numbers for nuclear. One is $34/MWH, which is a average cost of existing plants, another number is $169/MWH a number they describe as "Represents illustrative LCOE values for Vogtle nuclear plant’s units 3 and 4" Your source doesn't even support your statement! As for Hinckley, I have 2 objections. A you have cherry picked the least cost effective reactor in the world, and are trying to pass it off as typical, and B, it's levelized cost of energy is £128/MWh which translates to €146. Since we're apparently in the business of cherry picking, I chose Olkiluoto, with a levelized cost of €30/MWH. Unfortunately the anti-nuclear crowd in Europe has a very loose relationship with reality, but I think it's only prudent we stick to actual numbers here on HN. Relevant excerpt from the Wikipedia article: For example, Bloomberg New Energy Finance (BNEF), based on undisclosed portfolio of projects, estimated nuclear power LCOE at €190-375/MWh which is up to 900% higher than the published LCOE of €30/MWh for an actual existing Olkiluoto nuclear power plant, even after accounting for construction delays in OL3 block, although this number is based on an average LCOE with new and old reactors. My data might be old, but at least it isn't made up!
- ViewTrick1002 6mo agoDid you even read the footnote of the number you linked? > The analysis is based on publicly available estimates and suggestions from selected industry experts, indicating a cost “learning curve” of ~30% between Vogtle units 3 and 4. Analysis assumes total operating capacity of ~2.2 GW, total capital cost of ~$32.3 billion, capacity factor of ~97%, operating life of 70 years and other operating parameters estimated by Lazard’s LCOE v14.0 results, adjusted for inflation. 97% capacity factor for 70 years. Meaning for a "Vogtle" started today, i.e. entering planning in 2006 and operational by 2023 = 17 years we have: 2026 + 17 + 70 = 2114 Do you realize the absolute insanity of trying to predict the profitability of a new built nuclear plant into the 2100s? For anyone with a basic level of economic understanding that number is an admission that new built nuclear power is absolute insanity. EDF is already crying about renewables cratering the earning potential and increasing maintenance costs for the existing french nuclear fleet. Let alone the horrifyingly expensive new builds. And that is France which has been actively shielding its inflexible aging nuclear fleet from renewable competition, and it still leaks in on pure economics. And now you see the next part. That 97% capacity factor is also insanity in a world increasingly driven by renewables. EDF is today having trouble with their capacity factors reducing. How do you think that will play out? > Since we're apparently in the business of cherry picking, I chose Olkiluoto, with a levelized cost of €30/MWH. You do know that's wrong? Olkiluoto is also sitting up there with Hinkley, Flamanville and similar, but there are no public figures on the total cost. Only the settlement half a decade before the plant was completed, as costs and interest kept accumulating. The only difference is that they signed a fixed price contract and the French paid for the vast majority of the plant. So you can in some cases argue that the Finnish side had an acceptable cost. Not sure how you'll get the French to pay for this new built nuclear plant of yours. But I'm sure you'll work something out. Flamanville 3 is also sitting at ~180 per MWh. I also love that you quickly dimissed Hinkley Point C as the "worst project ever", even though the contract was signed before they even started building. Why don't you dare face reality? Why must new built nuclear power be the solution no matter the cost? Do you dare look up the proposed subsidies for Sizewell C? Even before they have started building the expect cost is almost up there with Hinkley Point C. EDF is at this point refusing any notion of a fixed price contract and are instead forcing a pure cost-plus expected profit pay as you go financing scheme. Where the ratepayers today pay enormous sums to maybe get some electricity in the 2040s. Have you looked at the Polish subsidy scheme? - The state gives a direct handout of ~€15B - The state takes all financial and construction risk - The plant gets a 40 year CFD which is adjusted to guarantee a profit for the plant. How can you square that with your view of nuclear power being cheap to build?