Working with multiple tons of material that dries out as you move it around is hard. There are a lot of steps between the concrete being mixed and when it final
by Aurornis 7mo ago
Working with multiple tons of material that dries out as you move it around is hard. There are a lot of steps between the concrete being mixed and when it finally reaches the pour.
Cutting out a piece of a slab and sending it to a lab is for post-pour validation in serious construction. There are pre-pour tests that are much simpler depending on the seriousness of what you’re building.
The slump test is rather simple, for example: https://en.wikipedia.org/wiki/Concrete_slump_test https://en.wikipedia.org/wiki/Concrete_slump_test
It’s basically a cone with handles and a procedure that’s easy to learn.