The really critical cost isn't monetary but time. There's plenty of places where the interconnect queue is holding up projects a lot: https://www.forbes.com/sit
by pjc50 7mo ago
The really critical cost isn't monetary but time. There's plenty of places where the interconnect queue is holding up projects a lot: https://www.forbes.com/sites/davidblackmon/2025/05/06/study-extended-interconnection-queue-times-plague-wind-solar/ https://www.forbes.com/sites/davidblackmon/2025/05/06/study-...
Same in parts of the UK. Scottish renewables are bottlenecked on transmission to London.
Whereas connecting generation to a substation near demand usually shows up as "negative demand" and doesn't require big upgrades.