Sure, I was being loose with my terminology, you are right to correct this. the point was in a 40 hour work week, it's reasonable for 15% of it to spent in co
by parasubvert 7mo ago
Sure, I was being loose with my terminology, you are right to correct this.
the point was in a 40 hour work week, it's reasonable for 15% of it to spent in coordination meetings, while 85% is directly related to progress.
Usually the retro is after the demo when other folks leave the room / drop from the zoom :-)
- sunrunner 7mo agoNot correcting, just clarifying for myself. I sure wish I had such a controlled environment with only 15% of time in coordination and where standup actually was 15 mins and not a segue into the everything meeting.