To be blunt; that isn't an appropriate application of the swiss cheese model to Fukushima. It isn't a swiss cheese failure if it was hit by an out-of-design-spe
by roenxi 7mo ago
To be blunt; that isn't an appropriate application of the swiss cheese model to Fukushima. It isn't a swiss cheese failure if it was hit by an out-of-design-spec event. Risk models won't help there. Every engineered system has design tolerances. And that system will eventually be hit by a situation outside the tolerances and fail. Risk models aren't to overcome that reality - they are one of a number of tools for making sure that systems can tolerate situations that they were designed for.
If Japan gets traumatised and changes their risk tolerance in response then sure, that is something they could do. But from an engineering perspective it isn't a series of small circumstances leading to a failure - it is a single event that the design was never built to tolerate leading to a failure. There is a lot to learn, but there isn't a chain of small defence failures leading to an unexpected outcome. By choice, they never built defences against this so the defences aren't there to fail.
> Many or all of these failures were necessary in combination for the accident to become the disaster it was.
Most of those items on your list aren't even mistakes. Japan could reasonably re-do everything they did all over again in the same way that they could simply rebuild all the other buildings that were destroyed in much the same way they did the first time. They probably won't, but it is a perfectly reasonable option.
Again I'm going from memory with the numbers but doubling the cost of a rare disaster in a way that injures ... pretty much nobody ... is a great trade for cheap secure energy. It isn't a clear case that anything needs to change or even went wrong in the design process. Massive earthquakes and tsunamis aren't easy to deal with.
- cpgxiii 7mo ago> It isn't a swiss cheese failure if it was hit by an out-of-design-spec event First of all, the design basis accident is a design choice by the developers of the plant and regulators. The decision process that produced that DBA was clearly faulty - the economic and social costs of the disaster so clearly have exceeded those of a building to a more serious DBA. > Again I'm going from memory with the numbers but doubling the cost of a rare disaster in a way that injures ... pretty much nobody ... is a great trade for cheap secure energy. It isn't a clear case that anything needs to change or even went wrong in the design process. Massive earthquakes and tsunamis aren't easy to deal with. This is absolute nonsense. For the cost of maybe maybe tens of millions at most in additional concrete to build the seawall a few meters higher, the entire disaster would have been avoided entirely (i.e. plant restored to operation). With backup cooling that could have survived the tsunami (a lower expense than building a higher seawall), all that would have happened at Fukushima Daiichi is what happened at its neighbor Fukushima Daini (plant rendered inoperable, no meltdown, no significant radioactive release). Instead, we are talking about a disaster that will cost a (current) estimated $180 billion USD to clean up (and there is no way this estimate is realistic, when the methods required to perform the cleanup barely exist yet).
- roenxi 7mo ago> The decision process that produced that DBA was clearly faulty - the economic and social costs of the disaster so clearly have exceeded those of a building to a more serious DBA. That isn't clear at all. We're effectively sampling from the entire globe and we've had 2-3x bad nuclear disasters since the 70s. Our safety standards appear to be overcautious given the relatively small amount of damage done vs ... pretty much every alternative. The designs seem to be fine. I'm still waiting to see the justification for the evacuations from Fukushima; they seemed excessive. People died. > For the cost of maybe maybe tens of millions at most... You haven't thought for long enough before you typed that. For this particular disaster, sure. But hardening against all the possible disasters is what needs to happen when you become less risk tolerant. It is the millions of dollars to prevent against this disaster multiplied by the number of potential disasters that you have to consider. Safety is expensive. The numbers aren't small, safety of that magnitude might not even be economically feasible. To say nothing of whether it is actually sensible. And once you get into one in 500 or thousand year events, some really catastrophic stuff starts happening that just can't be reasonably defended against. San Francisco and its fault springs to mind, I forget what sort of even that is but it is probably once a millennium or more often.
- drtgh 7mo agoFukushima was designed to be constructed on a hill 30-35 meters above the ocean, but someones decided would be cheaper to construct it at sea level in order to reduce costs in water pumping, others decided to approve this, and much latter, one decade before the disaster when was requested to reinforce the security measures within all the reactors at Japan, those in charge of Fukushima decided to ignore it, again, pushing for extensions year after year until it all blew up. Decades of bad decisions with a strong smell to corruption. https://warp.da.ndl.go.jp/info:ndljp/pid/3856371/naiic.go.jp/en/report/ https://warp.da.ndl.go.jp/info:ndljp/pid/3856371/naiic.go.jp... https://warp.da.ndl.go.jp/info:ndljp/pid/3856371/naiic.go.jp/wp-content/uploads/2012/08/NAIIC_Eng_Chapter1_web.pdf https://warp.da.ndl.go.jp/info:ndljp/pid/3856371/naiic.go.jp... https://web.archive.org/web/20210314022059/https://carnegieendowment.org/2012/03/06/why-fukushima-was-preventable-pub-47361 https://web.archive.org/web/20210314022059/https://carnegiee...