2 ms·
Actually a pulley might be slower when you think about it, lets say you have 10 guys trudging up the stairs each with 4gal in a bucket, that is 40gallons going
by ChuckMcM 14y ago
Actually a pulley might be slower when you think about it, lets say you have 10 guys trudging up the stairs each with 4gal in a bucket, that is 40gallons going up stairs, as opposed to one 4gallon bucket being pulled up, then emptied, then dropped down, then pulled up. So the question is how long the load / unload cycle is relative to the bucket brigade cycle.
When constructing my earthquake preparedness kits I spent some time looking at what happened when folks were in earthquakes both in reasonable infrastructure places (Chile) and less reasonable (Haiti) and non-existant (Turkey). That led to having a 'suture kit' in my day pack because one of the common themes was that there were emergency personnel around who were trying to help but they were often without or short on basic supplies to treat severe lacerations. I have no illusions about being able to suture myself up if I needed it, but I do have hope that I could find someone with the skills to do so. And by having distributed emergency supplies with lots of people, it means that as more people collect the better supplied the resulting group will be.
So back to our flood, a number of buildings include a lift system on the roof for moving heavy things in and out of the building that can't go by elevator. One preparedness solution would be to have a way to utilize that system with a bunch of buckets that would let people do this without carrying up the water directly. If it could be made part of the regular gear that they have on site for doing lifts, that might be a positive thing overall.