4 ms·
Well that's a problem the software industry has been building for itself for decades. Software has, since at least the adoption of "agile" created an industry
by Avshalom 8mo ago
Well that's a problem the software industry has been building for itself for decades.
Software has, since at least the adoption of "agile" created an industry culture of not just refusing to build to specs but insisting that specs are impossible to get from a customer.
- pydry 8mo agoAgile is a pretty badly defined beast at the best of times but even the most twisted interpretation doesnt mean that. It's mainly just a rejection of BDUF.
- daveguy 8mo agoAgile hasn't been insisting that specs are impossible to get from a customer. They have been insisting that getting specs from a customer is best performed as a dynamic process. In my opinion, that's one of agile's most significant contributions. It lines up with a learning process that doesn't assume the programmer or the customer knows the best course ahead of time.
- skydhash 8mo agoAnd good luck when getting misaligned specs (communication issues customer side, docs that are not aligned with the product,...). Drafting specs and investigating failure will require both a diplomat hat and a detective hat. Maybe with the developer hat, we will get DDD being meaningful again.
- bunderbunder 8mo agoI have found that it works well as an open-endlessly dynamic process when you are doing the kind of work that the people who came up with Scrum did as their bread and butter: limited-term contract jobs that were small enough to be handled by a single pizza-sized team and whose design challenges mostly don’t stray too far outside the Cynefn clear domain. The less any of those applies, the more costly it is to figure it out as you go along, because accounting for design changes can become something of a game of crack the whip. Iterative design is still important under such circumstances, but it may need to be a more thoughtful form of iteration that’s actively mindful about which kinds of design decisions should be front-loaded and which ones can be delayed.
- daveguy 8mo agoYou definitely need limits around it. Especially as a consulting team. It's not for open ended projects, and if you use it for open ended projects as a consultant you're in for a world of hurt. On the consultant side, hard scope limits are a must. And I completely agree that requirement proximity estimation is a critical skill. I do think estimation of requirement proximity is a much easier task than time estimates.
- user3939382 8mo agoI don’t want to put words in your mouth but I think I agree. It’s called requirements engineering. It’s hard, but it’s possible and waterfall works fine for many domains. Agile teams I see burning resources doing the same thing 2-3x or sprinting their way into major, costly architectural mistakes that would have been easily avoided by upfront planning and specs.
- bigfishrunning 8mo agoI always try to get the customer to provide specs, and failing that, to agree to specs before we start working. It's usually very difficult.