7 ms·
Trello is running on a diesel generator and may go down at anytime
- ahi 14y agoAccording to this post, the datacenter people are hauling 55 gallon drums up 17 flights of stairs. Diesel is ~7 pounds/gallon so a 55 gallon drum is ~385 pounds not including the container. Ouch.
- ry0ohki 14y agoThat's an insane real world human effort so that geeks can move bits around a screen!
- rhizome 14y agoHopefully they have stair-dollies.
- spolsky 14y agoLast we heard it's a bucket brigade doing 5 gallons at a time. Fog Creek president Michael Pryor is participating but mostly it seems to be the crew from Peer 1 networks doing the hard work, we don't want to take too much credit.
- ahi 14y agoBellevue Hospital had (has?) the same kind of operation going on.
- deleted 14y ago[deleted]
- dmor 14y agoI used Trello today, now I appreciate all that dragging and dropping and sorting and arguing (erm... discussion) we had around our board even more. Thank you, even though I would have keep using you guys even if it had been down all day.
- casca 14y agoWhile this is certainly a very rare event, I'm very glad that we've gone with redundant self-hosted solutions. Trello is great and is highly respected by the startup crowd, but to be held hostage to someone else's data decisions does not work for me once you get beyond the most basic level of a functioning company.
- jonknee 14y agoThis is always true until you're the one without hosting.
- atesti 14y agoIndeed! For me all hosted solutions are automatically dead. Too many startups just disappear so quick that I would never do business with them. (And while FogCreek hasn't disappeared so far, at least WebPutty is gone) Given that this is a unpopular view around here anyway, I want to add another thought: If your company has it's own webpage at datacenter A, including payment from datacenter/service B with CDN C and Twitter-integration D, using hosted FogBugz for support mails, hosting it's CSS-stylesheets on TRELLO which was baked by Google AppEngine, and using email provider E... Why don't you have downtime at leas one a quarter??? How can a system that relies on so many components and other companies be reliable? With all those AWS-outtakes? I don' understand this. If you host most of your stuff yourself, either everything works, or nothing. But not all goes down at the same time.
- tghw 14y agoJust to be clear, WebPutty is not gone. It's operational for another few months on Fog Creek's dime[1]. After that (or now, if you'd like) you can easily host it yourself on App Engine, probably for free, now that it's open source[2]. [1] https://www.webputty.net/ https://www.webputty.net/ [2] https://github.com/fogcreek/webputty https://github.com/fogcreek/webputty
- atesti 14y agoIf a service one once used is retired, open sourcing it is of course the very best outcome. Thanks for that!!! However (regarding AppEngine based solutions), as far as I know, if AppEngine goes down, there is no way to have any backup, is it? Only google can host AppEngine apps.
- lutze 14y ago"The superhuman folks at the data center are hauling 55 gallon drums of diesel fuel up 17 flights of stairs." I can't for the life of me think why someone would put a backup generator 17 floors up, these guys don't know you can buy mains cables longer than 4 feet? If it absolutely has to be 17 floors up, buy a fucking pump. Geeks. Sometimes we're so dumb it hurts.
- jimmybrite 14y agoIn most buildings, the generator is at the top floor, just saying. Source: I worked @ cbc on Queen street in ottawa,ON, and the generator is on the top floor.
- lutze 14y agoMakes sense actually, probably in case of flooding. Doesn't make that pump any less sensible though!
- mds_ 14y agoApparently the pumps got flooded: http://status.fogcreek.com/2012/10/fog-creek-services-updates.html http://status.fogcreek.com/2012/10/fog-creek-services-update... (near the bottom)
- lutze 14y agoWell, now I do feel like a cunt. Past my bedtime, so didn't connect this with that wee bit of weather the East coast USA experienced recently. Sincerely hope lugging diesel remains the least of their worries.
- jessaustin 14y agoThis is reminiscent of what happened at Fukushima Daiichi, although with less dire consequences.
- spolsky 14y agoI suspect that's for ventilation reasons
- jsight 14y agoThis story reminds me a little of this: http://en.wikipedia.org/wiki/Interdictor_(blog) http://en.wikipedia.org/wiki/Interdictor_(blog) It turns out that many backup power plans have not been designed with longterm flooding in mind.
- ISL 14y agoAlso, pumps must always be located at the bottom to pull liquid uphill by more than ~30'. Storing large tanks of diesel fuel on the 17th floor (or higher), is a heavy and perhaps dangerous situation. An always-submerged in-tank pump, not unlike that of a water well, powered via a sealed line from the generators above could, in principle, avoid this problem. I hope the generators are able to power some sort of mechanical lifting arrangement. Manually hauling the drums is mighty hard.
- jlgreco 14y agoI remember it being 30' for water, but it should be a bit more for diesel (since diesel is not as dense as water). Mercury, an obviously much denser fluid, can only be pulled up by a vacuum a much shorter distance (around 760 millimeters iirc). Still, the extra height isn't going to buy you much.
- mhp 14y agoWhen I was carrying buckets of diesel up the stairs, I did notice that it was a lot lighter than water. Still not great after 17 flights, but a lot lighter than a bucket full of water.
- ISL 14y agoI should've remembered the density difference... According to omniscient Wikipedia, diesel is 83% the density of water, so the 33 feet that water can be lifted via suction becomes ~38'. The Trieste used the buoyancy of (incompressible) gasoline to enable a return trip from the bottom of the Mariana Trench. Strong work lifting all that fuel!
- dctoedt 14y agoI'm baffled that the powers that be in NYC didn't learn from Houston's experience with Tropical Storm Allison in June 2001. All the hospitals at the Texas Medical Center had their basements and ground floors flooded; there went their generators [1]. (I was part of a large group of volunteers from all over the city that helped to evacuate patients for transfer; it was spooky seeing a grand piano floating in a below-grade-level lobby of one of the hospitals.) My then-employer's building had its basement flooded; we were on floors 19 through 25, but our electricity and phones and Internet were gone --- and this, three weeks before the end of Q2. Our developers and IT people hauled computers down the stairs, and we moved to temporary space for several weeks, but we still missed, that is, we didn't achieve the sales and revenue targets that we had forecast for analysts. I'm given to understand that because of the lessons learned from Allison, Houston isn't quite as vulnerable to flooding any more. [1] http://en.wikipedia.org/wiki/Tropical_Storm_Allison#Texas http://en.wikipedia.org/wiki/Tropical_Storm_Allison#Texas
- spolsky 14y agoThe bottom line is that people just don't plan for 100 year storms. I suspect that's because the number of things that go wrong once every 100 years is so large and the cost of handling each one is so disproportionate to the risk that it's not cost effective. Think about it this way: under what circumstances would you double your hardware budget to avoid 1 day of downtime every 100 years?
- saalweachter 14y agoWhen the Brooklyn-Battery tunnel is flooded, it's hard to blame anyone else in the city for being insufficiently risk-adverse. You might as well blame a data-center for going down when the building it's in burns to the ground.
- ChuckMcM 14y agoThis is exactly right. The truth is you can spend infinite money on various scenarios, and that cost has to be paid. The manufacturer side of this is 'warranty', you guarantee that something won't break in 90 days, a year, 5 years, what have you and you price to that probability. Another risk in New York that will take data centers offline, earthquake. It will happen at some point, but the chance of it happening in the next 100 years small (contrasted to Santa Clara where we're much more likely to get an earthquake than a flood). So you could pay to have your Manhattan high rise put onto base isolators and proofed against an earthquake, but what size earthquake? Magnitude 3? Magnitude 6? Magnitude 9? And then if your building is still standing brightly after the Magnitude 9 earthquake are your fiber optics still there? How about the network tie point? Did it fall into a hole in the ground? So the cost to make all of Manhattan resistant to a 9.0 earthquake? Its impressive that they are carrying up the fuel. I might be inclined to see if I could tractor in a 12kW generator to run one elevator. Sure you'd be burning fuel at both ends but it would be easier on the crew hauling the petrol.
- ljlolel 14y agoTrello database can't be that big. Why not just copy it, zip it up, and transfer it over to the west coast?
- guiambros 14y agoMy surprise is that a respected team and high profile company would make such a basic mistake of relying on a single datacenter, within a single availability zone -- in lower Manhattan. And knowing since last week that Sandy was coming, and this was a real threat. And I'm not even talking about Trello (which is still just a hobby for Joel & team), but this also brought down Fog Creek and all their commercial services and paying customers. The positive side of Sandy (if there's any) is that people will really take more seriously the idea of "expect the best; plan for the worst". And Amazon will likely see a spike of new customers in the next following days.
- spolsky 14y agoLet me update this: we've been working all day on moving Trello to AWS, a project which is now underway. If all goes well (fingers crossed, etc) we'll be up and running on AWS very soon. There are still other services in the flooded New York data center (FogBugz, Kiln, Copilot) and we are making plans to physically move servers to a new data center as quickly as possible if the flooded data center falls over, but a physical move of 5 racks could take a whole day so I hope that doesn't happen. Separately, Stack Exchange, which is in the same data center, is running off of its hot backup in Oregon. We would have liked to have completely redundant data centers for FogBugz on Demand and Kiln on Demand to avoid even a few hours of downtime, but because those services rely heavily on giving every customer their own SQL database, there is almost no reasonable way to get fast failover to a different data center. We can do it with Stack Exchange because there are only a couple of hundred databases. We've been building a SAN solution which will make it possible to hot swap out to another datacenter, one day, but that project is not complete.
- deleted 14y ago[deleted]
- drewcrawford 14y ago> but because those services rely heavily on giving every customer their own SQL database, there is almost no reasonable way to get fast failover to a different data center Why did you say you could do fast failover to LA in 2007? [1] It was the case then that every customer had their own SQL database too. I'm not trying to be snarky, your team is obviously putting forth some heroic effort. I'm just an affected customer that is curious why the question seems to have two mutually exclusive answers. [1] http://webcache.googleusercontent.com/search?q=cache:lHEK939AKiEJ:www.joelonsoftware.com/items/2007/07/09.html+&cd=5&hl=en&ct=clnk&gl=us&client=safari http://webcache.googleusercontent.com/search?q=cache:lHEK939...
- guiambros 14y agoI'd be curious to see if there's any update to FBOD architecture. The idea of using self-hosted servers running SQL Server and IIS already sounded eccentric 5 years ago, but given the number of options today, it'd be hard to still justify such a monolithic solution. In all fairness, Joel recognized in the article that the initial decision was based on their previous experience with Microsoft -- and AWS was still incipient in 2007 -- so it made sense at the time. I doubt this is still the case. Even less if you consider the costs of Sandy - duplicated servers, migration, hours lost, unhappy clients, etc.
- tzs 14y agoI can't tell for sure, but a little Googling seems to indicate that there is natural gas available in at least some New York neighborhoods. Why aren't data centers built where natural gas is available? A natural gas powered generator could run from the gas lines, which should be more reliable than fuel that has to be trucked in.
- ry0ohki 14y agoI suspect because Natural Gas Lines can fail in a disaster situation as well, where you can "always" truck in diesel. If I'm ever building an insane data center I'd do both now!
- decktech 14y agoNYU operates a CoGen plant under 251 Mercer that runs on natural gas and can fail over to diesel. It provides power, steam, and cold water for air conditioning to many of surrounding properties. The net result is that NYU servers frequently stay up during power outages, while their ISP usually goes down.
- Spooky23 14y agoNatural gas and steam are pervasive in NYC. I think they are used less often because you cannot control delivery and running big gas pipes in a retrofitted building is expensive. Keep in mind that Manhattan has NEVER flooded before.
- alh 14y agoWhy would you host in New York, how dumb? Everyone knows that when aliens attack, disaster strikes, time for nuclear armageddon or it's the end of the world, that it all starts in New York. I've seen the movies so there!
- gecko 14y agoTrello has switched to AWS as of this posting. The Trello team are insane, and I'm very proud to be part of the same company that they are.