5 ms·
This depends; my UK 3.9kWh installation was permit-exempt, requiring only an MCS certified installer so I could be eligible for feed-in tariffs. The permit regi
by pjc50 8mo ago
This depends; my UK 3.9kWh installation was permit-exempt, requiring only an MCS certified installer so I could be eligible for feed-in tariffs. The permit regime changes as the schemes get larger.