3 ms·
Thanks, I realized after I wrote it that the size of their staff was really the variable I was missing. Agreed that's not a remarkably high rate with such a lar
by ericyd 8mo ago
Thanks, I realized after I wrote it that the size of their staff was really the variable I was missing. Agreed that's not a remarkably high rate with such a large engineering org.