3 ms·
It's not a base load problem, it's an intermittency problem. Which you solve with dispatchable generation. Which nuclear is particularly ill suited for. >
by bryanlarsen 9mo ago
It's not a base load problem, it's an intermittency problem. Which you solve with dispatchable generation. Which nuclear is particularly ill suited for.
> in the time available.
Which also eliminates nuclear as an option; Ontario is building new nuclear power that is projected to become available in the late 2040's. After the inevitable delays that'll be the 2050's. Way too late.
The solution is simple & cheap, though nobody wants to admit it. Use paid-for existing zero-carbon generation first (aka existing nuclear, hydro, etc), then add solar & wind to cover ~60% of needs, then add batteries to cover ~95% of needs, and then use natgas peakers to cover the last ~5%.
Environmentalists don't like it because it's not 100% carbon free. Anti-environmentalists don't like it because it's 95% solar/wind/batteries.
Economists and pragmatists should love it because it's the cheapest.