3 ms·
Does this include the cost of gas backup?
by KevinMS 8mo ago
Does this include the cost of gas backup?
- benj111 8mo agoYou mean the gas power stations that are already built?
- KevinMS 8mo agoevery wind/solar farm on the grid needs backup gas turbines, whether its already built or not, which costs money either way, but those are never included in the cost.
- benj111 8mo agoIn the UK, demand has been steadily going down. We don't need new gas power stations to cover increased usage.
- KevinMS 8mo agoyou aren't getting it. You need to match, on demand, any solar or wind generation. On demand means gas turbines, because nothing else can power up quickly enough. X amount of power generation from a wind farm needs X amount of capacity sitting around waiting to come online.
- benj111 8mo agoI am getting it. I'm saying 10 years ago demand was X and we had the gas capacity we needed. Now demand is X-10. We have 10 too much capacity without building any more gas generation. I haven't even gone into the presumption that it needs to be gas. What about batteries, hydro? And that's going on the assumption that all wind and solar is going to suddenly drop to zero. And yes it might go low but not all at once without warning. So yes. I get it. It's you that doesn't seem to.
- KevinMS 8mo ago> We have 10 too much capacity without building any more gas generation. YOU STILL HAVE TO RUN THEM. Maintenance, upkeep, crews, and then you have to subsidize any loses they have for sharing the load to keep them online. Basically any wind farm is TWO power plants, the wind farm and its backup. They never count that backup in these cost assessments.
- DamonHD 8mo agoYou do realise that the last 2 times the GB grid had major glitches (since 2000) part of the issue was thermal (nuke, gas, coal) plants going down in big chunks beyond the overall system capacity to cope. 1) The system works as a system 2) Big single plants going down (eg 'tripping') are more hazadous to grid stability than smaller individual generators 3) All generators have to be 'backed up' by spare capacity, especially big thermal 4) Yes this stuff is priced in, especially as in some grids some of the time it is over 50% of the generation