3 ms·
The fab in Washington is very old (notice it's still equipped for 8 inch wafers) and so pretty irrelevant to Nvidia's business. I'm not quite sure what process
by KK7NIL 9mo ago
The fab in Washington is very old (notice it's still equipped for 8 inch wafers) and so pretty irrelevant to Nvidia's business.
I'm not quite sure what process they run there but I believe it was an acquisition 10+ years ago, not built from the ground up by them.
Edit: their Japan fab is also a mature node so not very relevant here.
And their Arizona fab is a very very small portion of their volume and with far worse margin.
- pinot 9mo agoWA fab is verrry old and makes commodity products, think like small microcontrollers etc. 160-350nm processes.