3 ms·
That's also not what I said. Germany was aiming for 45 years initially (likely planning for overhauls + recertification then, rather than shutdown). Instead the
by chmod775 9mo ago
That's also not what I said. Germany was aiming for 45 years initially (likely planning for overhauls + recertification then, rather than shutdown). Instead they shut down at 35.
However if left as is, all of those shut down in 2011 would have been shut down by ~2020 anyways.
- bmandale 9mo agoMany reactors can be updated to last longer than their initial design lifetime. This is usually far cheaper than building a new reactor. I expect that if the political environment in germany was more conducive to nuclear, that is what they would have done.
- UltraSane 9mo agoNo, they could all have gotten 20 year extensions and operate until 2040. Nuclear reactors should be run for as long as possible because they cost so much to build but are very cheap to operate.