3 ms·
Hi, these projects already have grid connection dates so no new grid upgrades are required to deliver. The developers of the wind farm have to factor in transm
by gehsty 9mo ago
Hi, these projects already have grid connection dates so no new grid upgrades are required to deliver. The developers of the wind farm have to factor in transmission charges (tnuos) into their bids that pay for these.