3 ms·
Call me sceptical, but I suspect if this works very well it will be used in weapons. Which then leads me to think the whole thing is a smoke screen, not sure w
by 123pie123 9mo ago
Call me sceptical, but I suspect if this works very well it will be used in weapons.
Which then leads me to think the whole thing is a smoke screen, not sure why
- avianlyric 9mo ago100%, but smoke screen is over selling it. From the article > The project is being carried out in collaboration with Transport for London, QinetiQ, PA Consulting, Imperial College London and University of Sussex. QinetiQ is a UK weapons developer, probably the UKs largest. So the defence angle isn’t really being hidden. Older articles on this project from elsewhere outline the defence angle even more explicitly: https://www.theguardian.com/science/article/2024/jun/15/london-underground-quantum-compass-gps-subatomic-instrument-locations https://www.theguardian.com/science/article/2024/jun/15/lond... But IanVisits is a transport focused blog, so the article has a transport focus, rather than a defence focus. As to why any of this is happening on the underground, that’s pretty simple. Tube trains are a good real world test bed for this technology. Shove your quantum box on an existing train, drive it through the existing tunnels a few times as part of a normal tube service. Compare the run result and validate how accurate your technology is. It’s a lot cheaper than putting it on a boat or a submarine. Not to mention Imperial College London is based in… London. They’re literally a five minute walk from a tube station.
- 123pie123 9mo agoI had missed the collaboration list, being tested on trains makes complete sense
- petermcneeley 9mo agoYes this is weapons technologies. Many targets are fixed (on the earth). If you can fly by wire jamming technology is useless. This was solved for strategic weapons 40 years ago at great cost.
- bluGill 9mo agoThe real problem is weapons often have power and weight limitations that don't apply to trains. So you can build large, power hungry prototypes and test them on a train. Once you work out the bugs found there you then start the miniaturization and lower power versions for where you really want it (or save a lot of money by not doing that work for something that you know can't work anyway)