2 ms·
The Lower Thames Crossing project in the UK already generated 360000 pages of paper in the planing phase: https://www.newcivilengineer.com/latest/lower-thames-
by inglor_cz 1y ago
The Lower Thames Crossing project in the UK already generated 360000 pages of paper in the planing phase:
https://www.newcivilengineer.com/latest/lower-thames-crossing-timeline-of-the-proposed-uks-longest-road-tunnel-08-10-2024 https://www.newcivilengineer.com/latest/lower-thames-crossin...
The Works in Progress magazine says that, in comparison, environmental assessment for an extension of a line of the Madrid metro, had only 19 pages.
https://worksinprogress.co/issue/how-madrid-built-its-metro-cheaply https://worksinprogress.co/issue/how-madrid-built-its-metro-...
Granted, this is not completely the same, but 360 000 pages is a LOT. Most civilizational infrastructure around the world was built using orders of magnitude less bureaucracy.
That is overregulation for me, and I don't think this pushes any agenda except "360 000 pages for a tunnel is freaking insane".