Cost varies with the site conditions. It's one of the many things that push nuclear construction costs up; every build needs to take into consideration the geog
by zdragnar 11mo ago
Cost varies with the site conditions. It's one of the many things that push nuclear construction costs up; every build needs to take into consideration the geographic nature of the site (bedrock levels, etc) and so every location requires customizations to the design.
With that said, while it doesn't provide numbers, the article does say the refurbishment (costing $1.6 billion, estimated) will be cheaper than a new build. It'll also likely be much faster, projected to open in 2028.
A quick google search puts construction costs of new nuclear of a Unit 2 size in the $5-10 billion range. 3 Mile Island itself was constructed for $2 billion in 2024 inflation-adjusted dollars. All in all, refurbishing sounds like a good bargain compared to a green field build.