F-35B was added to JSF to ensure Lockheed (who had been working on exactly that since 1980s even to the point of licensing designs from USSR) was the only compa
by p_l 11mo ago
F-35B was added to JSF to ensure Lockheed (who had been working on exactly that since 1980s even to the point of licensing designs from USSR) was the only company that could win the contract.
- mmooss 11mo agoWhat evidence is there of that? And without the F-35B, what would be flown by the US Marines, and by most other countries' aircraft carriers, all of which require vertical take-off and landing?
- dboreham 11mo agoHarrier 2.0
- p_l 11mo agoLate addition of VTOL variant on mandates common airframe when it was well known that only Lockheed had anything in pipeline that could match the requirements and even then -B meant delays and issues due to inherent complexity of VTOL (to the point Britain nearly canceled the order for -B, only finding out it was too late to refit Queen Elizabeth carriers with CATOBAR kept the purchase afloat) Reality is that VTOL model is ultimately a niche variant whose mandated commonality with air force and CATOBAR carrier variants impacted negatively both non- and VTOL options. However, slapping supersonic VTOL requirement on what was supposed to be F-16 replacement in the given timeframe meant Lockheed would automatically get ahead as every other vendor had to scramble nearly from scratch while L-M had fresh supersonic VTOL data from both their own lab work and experimental work on Yak-141
- mmooss 11mo agoThat is a theory, but the evidence is that VTOL F-35s are needed and used widely. > -B meant delays and issues The -B was the first of the three variants to become operational.
- p_l 11mo agoFor very special meaning of operational that could be summarized as "USMC could not allow it to fail". And the delays were on the whole project due to forced commonality (in addition to L-M being L-M)
- mmooss 11mo agoCan you provide any evidence? What I'm stating are public facts. We can always come up with reasons, but we need evidence of what actually happened.
- potato3732842 11mo agoYou'll never find evidince hard enough to fashion the sort of club people who ask such questions ought to be bludgeoned with. Do you really think anyone would be so stupid as to leave hard evidince? That's the magic of the whole process, they can do those things fully within the bounds of the process. They decide (or don't), often at the urging of lobbyists, or non-lobbyists parties who themselves typically aren't completely impartial, what they want. And often they have a specific product in mind that they want, but they can't say that so they write the requirement to all but say it. Often times this is very reasonable and comes as the result of the end user having used multiple products or having used multiple contractors and knowing from experience with near certainty what or who they want. In the alternate case where it's pork, this is often how upstarts get their start. Whoever the prime is doesn't wanna pay out the ass for someone else's pork that's been inserted into the requirements so connections get leveraged and several dominoes later a subcontractor to someone is under contract + NDA to buy a controlling stake in an idling paper mill and refit as necessary the small town's wastewater plant it dumps into because that is how they are going to provide the filter media meeting the performance specified in the requirements without being forced to pay out the ass for the product the lobbyists ghost wrote into it. The prime has basically entered into contract to create a company making a competing product out of thin air. There are many funny stories like this kicking around the beltway.