3 ms·
> I mean, let the client make the proposal, accept the commission at a lower rate that doesn’t include what you’d have charged to design it, and then build it.
by SoftTalker 1y ago
> I mean, let the client make the proposal, accept the commission at a lower rate that doesn’t include what you’d have charged to design it, and then build it.
The client will still blame you when it doesn’t meet their real needs. And rightfully so, as much as a doctor would still be blamed if he followed a cancer treatment plan the patient brought in from ChatGPT
- the_other 1y agoWhen I talked about taking on the work at a lower rate, I had imagined that being part of a negotiation in which the provider says somethibg like “I have a strong feeling based on experience that this suggestion the client is determined get implemented wont work as well as they hope for the stated problem. I would like to work with them at my usual rate on refining the design, or I can just build it, and they must accept responsibility for the non-functional consequences, for this other fee.” Sorry that wasn’t clear.