2 ms·
Very much so. It can probably be scaled to a degree, via structure and process. I’m not a huge fan of the CMMI, but Level 5 prescribes pretty much exactly that
by ChrisMarshallNY 1y ago
Very much so. It can probably be scaled to a degree, via structure and process.
I’m not a huge fan of the CMMI, but Level 5 prescribes pretty much exactly that, though applied to the production process, as opposed to the end product.