2 ms·
Engineer does 40 outreaches in a week and says the results are “not that amazing” lol. If I said that I coded for 15 minutes a day for a week and wasn’t impres
by paulcole 1y ago
Engineer does 40 outreaches in a week and says the results are “not that amazing” lol.
If I said that I coded for 15 minutes a day for a week and wasn’t impressed by the results, what would an engineer say?
- wahnfrieden 1y agoI do 40 personalized outreaches in two hours. Edit: I shared a couple details in my other reply under this post